Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 40 results ...

Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work, Unpublished PhD Thesis, , University of Michigan.

Al-Hussayen, M A (1980) Building problems in Saudi Arabia: The need for building research, and the development of building research approaches, Unpublished PhD Thesis, , University of Michigan.

Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics, Unpublished PhD Thesis, , University of Michigan.

Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality, Unpublished PhD Thesis, , University of Michigan.

Chen, T Y-J (2019) Advancing quantitative risk analysis for critical water infrastructure, Unpublished PhD Thesis, , University of Michigan.

Choi, B (2018) The role of socio-cognitive process in construction workers' safety behaviors, Unpublished PhD Thesis, , University of Michigan.

Chung, K H Y (2022) Data fusion, hedonic pricing, and blockchains: Lowering investment barriers for sustainable infrastructure, Unpublished PhD Thesis, , University of Michigan.

Colberg, M R (1950) Federal control of construction following World War II, Unpublished PhD Thesis, , University of Michigan.

Dias, A, Jr. (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects, Unpublished PhD Thesis, , University of Michigan.

Dzeng, R-J (1995) CasePlan: a case-based planner and scheduler for construction using product modeling, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Michigan.

Han, S-H (2004) A working prototype of distributed collaborative architectural design system, Unpublished PhD Thesis, , University of Michigan.

Hasell, M J (1983) Gaming simulation: A communication tool for architects and designers, Unpublished PhD Thesis, , University of Michigan.

Henn, R L (2013) Moving targets: Managing interinstitutional relationships in green building design and construction, Unpublished PhD Thesis, , University of Michigan.

Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems, Unpublished PhD Thesis, , University of Michigan.

Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry, Unpublished PhD Thesis, , University of Michigan.

Jebelli, H (2019) Wearable biosensors to understand construction workers' mental and physical stress, Unpublished PhD Thesis, , University of Michigan.

Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya, Unpublished PhD Thesis, , University of Michigan.

Kalampakorn, S (2000) Stages of construction workers' use of hearing protection, Unpublished PhD Thesis, , University of Michigan.

Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities, Unpublished PhD Thesis, , University of Michigan.

Kirk, S J (1992) Improved design decision-making using small group value engineering gaming/simulation, Unpublished PhD Thesis, , University of Michigan.

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures, Unpublished PhD Thesis, , University of Michigan.

  • Type: Thesis
  • Keywords: construction cost; reinforced concrete; construction method; design decision; estimating; expert system; integration; structural design; variations; cost information
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/303998633
  • Abstract:
    Architectural and engineering decisions among design alternatives at all stages of design should be based on accurate cost information. Currently, numerous cost estimating systems are available in the construction industry, but none of these enable the architectural engineer to check the detailed construction cost during the design process. This research develops a cost estimating model that provides detailed cost information on design alternatives at all stages of design. The model, called the Automated Interactive Cost Estimating System (AICES), is implemented for reinforced concrete building structures. AICES gives the users access to reinforced concrete cost information that is sensitive to variations in architectural and engineering design, allowing them to make intelligent design decisions. The core of AICES is automated design and detailed cost estimating of prototype structures based on input from more general design. Design is developed through a hierarchical design modification process at schematic, preliminary, and detailed design levels. Design input at each level produces a usable detailed reinforced concrete structural design that is itself input to automated detailed estimating. This provides accurate, realistic detailed estimates of costs for alternative values of design variables. AICES is composed of databases, a knowledge base, and application programs to support design modification and perform detailed cost estimating. The databases consist of a project-independent database containing the generic information, and a project-dependent database storing the specific information for a project. The databases are linked by key items to provide default detailed designs and perform detailed cost estimating. The knowledge base consists of rules that represent construction knowledge to guide the user in selecting a suitable construction method. The implementation programs are coded in a relational database software and a rule-based expert system package. This research contributes to the integration of design and construction by linking the cost estimating process to the design process. It also contributes to the development of a design and cost estimating system by establishing a project database in which the design and estimating data are efficiently retrieved and used.

Leu, S-S (1992) Object-oriented representation model of construction technology information, Unpublished PhD Thesis, , University of Michigan.

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams, Unpublished PhD Thesis, , University of Michigan.

Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment, Unpublished PhD Thesis, , University of Michigan.

Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work, Unpublished PhD Thesis, , University of Michigan.

Martin, S D (1981) Building contracts in classical Roman law, Unpublished PhD Thesis, , University of Michigan.

Mason, B (2023) Advancing autonomous green stormwater infrastructure, Unpublished PhD Thesis, , University of Michigan.

McIntosh, J F (1984) The application of the relational data model to computer-aided building design, Unpublished PhD Thesis, , University of Michigan.

Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system, Unpublished PhD Thesis, , University of Michigan.

Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies, Unpublished PhD Thesis, , University of Michigan.

Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan, Unpublished PhD Thesis, , University of Michigan.

Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach, Unpublished PhD Thesis, , University of Michigan.

Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations, Unpublished PhD Thesis, , University of Michigan.

Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics, Unpublished PhD Thesis, , University of Michigan.

Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway, Unpublished PhD Thesis, , University of Michigan.

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost, Unpublished PhD Thesis, , University of Michigan.

Tharachai, T (2004) Multiple project resource scheduling for construction, Unpublished PhD Thesis, , University of Michigan.

Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation, Unpublished PhD Thesis, , University of Michigan.

Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction, Unpublished PhD Thesis, , University of Michigan.

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Michigan.